Conjecture 3 Progress Audit - 2026-03-30¶
Executive Verdict¶
Minimal-target route is effectively closed in the intended static 2D SWAP-only setting, while the full conjecture remains open because the compiler-native congestion-dilation interpretation is not yet globally realized in a pivot-robust classical routing formalism.
Readiness Scores¶
- Minimal target proof readiness: 92-97
- Full lower-bound side readiness: 62-72
- Full upper-bound side readiness: 35-50
- Full disproof readiness: 20-35
- Overall full proof readiness: 50-60
Main Closed Items¶
- Static near-square 2D lower-bound objective is literature-backed in the map.
- Generator-invariant cut-rank functional route is established in theorem-level form.
- Naive token-crossing extraction route is ruled out; service-based replacement is identified.
Main Open Items¶
- Lift from stabilizer-measurement and submodular-cut formalism to full compiler-native CD statement.
- Pivot-robust global classical interpretation of the fundamental-graph realization.
- Full two-sided bound completion (especially upper-bound side) in the exact conjecture contract.
Delta Markers To Track Next Time¶
- Any new theorem proving or refuting pivot-robust routing realization.
- Any theorem giving linear balanced-cut intrinsic rank for the targeted Quantum Tanner parity-check spaces.
- Any extension from SWAP-only/measurement model to broader compilation maps that still preserves CD equivalence.